Turn barren, uncultivable, or farming land into a highly secure infrastructure asset class. We specialize exclusively in constructing authorized 0.5 MW to 2 MW ground-mounted energy plants connected directly to local substations.
We do not construct rooftops, general residential models, or water pumps. We only build Component A grids.
Every plant is linked to long-term government utility agreements protected from local market variances.
Engineering optimization handled completely inside the mandatory substation line proximity map limit.
A breakdown of why this specific decentralized framework offers unmatched structural stability compared to standard solar models.
Power Purchase Agreements (PPAs) are executed directly with state electricity utilities for exactly 25 years. This provides clear, uninterrupted revenue forecasting, unimpacted by external commercial market drops.
The scheme is uniquely configured to revitalize non-cultivable, rocky, or water-stressed fields, transforming low-yield rural plots into institutional-grade infrastructure assets.
Because the long-term tariff payout is legally guaranteed by government utilities, major domestic banks accept the PPA contract as primary collateral, clearing paths for up to 70% debt project financing.
By injecting electricity directly into the closest local 33/11 KV distribution network, projects skip complex interstate transmission open-access lines and heavy technical voltage losses.
A comparison showing how technical requirements scale along with statutory targets under MNRE criteria.
| Target Plant Scale | Land Footprint Needed | Est. Generation / Year | Est. Annual Revenue |
|---|---|---|---|
| 0.5 MW (500 kW) | ~1.25 to 2 Acres | 9,00,000 Units | ₹ 29.25 Lakhs |
| 1.0 MW (1000 kW) | ~2.5 to 4 Acres | 18,00,000 Units | ₹ 58.5 Lakhs |
| 1.5 MW (1500 kW) | ~4.0 to 6 Acres | 27,00,000 Units | ₹ 87.75 Lakhs |
| 2.0 MW (Statutory Cap) | ~5.0 to 8 Acres | 36,00,000 Units | ₹ 1.17 Crores |
Simulate continuous output values using the MNRE operational baseline framework metrics below.
Submit your site parameters below. Our engineering team checks your local substation's headroom and capacity parameters within 24 business hours.